Product range: Dry and liquid-immersed transformers.
Product parameters: Voltage 35kV, capacity 10000kVA and below.
Overview:
The transformer assembly line intelligent testing system - Model III can transport the transformer to be tested to the specified test area through the existing overhead crane in the workshop. The entire test workstation is movable, and the transformer does not need to be moved. The test tooling can cover the entire test area for testing.


Advancement:
Intelligentization: By applying a large number of intelligent switching switches and intelligent control systems, we can realize the one-time wiring and automatic testing function of all experimental projects. Compared with the factory testing of traditional transformer factories, the test efficiency is improved by 70%, and the test personnel save 70% of their time.
Automation: The first automatic tap changer adjustment device in China, which can realize unmanned operation during the direct resistance and transformer ratio tests. All test instruments are controlled by the upper computer software and read and calculate the test data, reducing human intervention and ensuring the accuracy of test data.
Digitalization: The identification of the test products is all done by the barcode scanner, and the basic information of the products is directly read into the MES database. All the test data after the completion of all test items are stored in the MES and QMES databases, realizing the interconnectivity between the testing system and the MES and QMES systems.