Intelligent detection of new energy transformers - high and low voltage testing.

Automation level: Routine factory tests are divided into high-voltage and low-voltage test areas. The low-voltage test area generally uses a mobile test vehicle for testing, and the computer automatically completes the testing process; the high-voltage test area can generally be designed as a fixed workstation or a flexible workstation, with one-time wiring for no-load test, induction withstand voltage, and power frequency withstand voltage, and the computer automatically completes the testing process.

Testing efficiency: The common configuration is 2 low-pressure test vehicles and 2 high-pressure workstations. Two testers can easily complete the testing of 20 products in 8 hours a day. If this efficiency is achieved in the traditional testing mode, at least 4 people are needed, and the work intensity is high.

Advantages: Easy to operate, no need for professional technicians, and can start work after simple training;

Flexible testing can utilize existing vehicles for circulation;

All test projects are tested by the host computer software, which can realize the paperless operation of the test station.